Apartments
2–3 bedrooms · 25 homes
Arenal · Under construction
Aelca’s first 25-home phase close to the Arenal.
The development
Adeya Jávea is the larger of Aelca’s two neighbouring projects, with 25 two and three-bedroom homes, parking, storage and communal facilities. Aelca publishes a current unit table and shows works as started, making it possible to compare exact areas and prices rather than rely only on a starting figure.








The promoter
Aelca says it has managed residential projects nationally since 2012. The two Adeya schemes are separate developments, so the legal promoter, programme and availability for Adeya Jávea must be read independently from Adeya Jávea II.
What to confirm
Use the published information as a starting point. The developer’s current price list and the documents for the exact home should settle the details before any reservation payment is made.
2–3 bedrooms · 25 homes
Separate purchase and programme from Adeya Jávea II.
Applicable taxes and purchase costs are additional unless expressly stated otherwise.Current availability and delivery date.
The shared setting
These are published development-level features. Parking, storage, terraces and energy systems must still be confirmed for the exact home and in its signed specification.

Living in Arenal
Calle Cannes sits close to the Arenal while retaining a residential setting. Buyers should walk the actual route to the beach and assess road position, neighbouring buildings and summer activity.
Who it may suit
Current opportunities
Request the dated availability table, works update and contractual delivery date. Confirm the exact parking and storage references for the chosen home.
Adeya Jávea should remain distinct from Adeya Jávea II in the resale market. Scheme name, plot and original storage allocation will matter.
Project questions
Short answers based on the latest reviewed material. The exact unit schedule, specification and purchase documents take precedence.
No. They are separate developments on different plots with separate home counts, stock and programmes.
Ask for the dated unit schedule, signed floor plan, full specification, payment schedule, legal promoter details and contractual completion position for the exact home.
No. Adeya Jávea is the first 25-home scheme and Adeya Jávea II is a separate development on another plot. Availability and contracts must be checked independently.
Aelca reports that construction has started. The current works position, contractual completion date and live unit list should be requested for the first scheme.
Last verified 2026-08-27. Images identified as illustrative do not depict the completed development. Prices, availability, specifications and dates must be confirmed before purchase.